Met Mr. Pravin Pardeshi chief engineer MM of MSEB at Prakashgad office at Bandra E, Mumbai around 2.30 pm on 25.8.25 with regards to installation of smart electric meters illegally and without authority of law.

Met Mr. Pravin Pardeshi chief engineer MM of MSEB at Prakashgad office at Bandra E, Mumbai around 2.30 pm on 25.8.25  with regards to installation of smart electric meters illegally and without authority of law.

Informed him about that

1. MSEB shall disclose the material relied upon to show their losses is more than 20% to fit in the criteria of objectives to reduce the losses to 15%
2. Metrology dept certificate certifying that the smarteters installed have tested sealed and inspected to be correct and not manipulated.
3. All study carried out to stop manufacturing of static electronic meters before verifying the correctness and competency of the Smart electric meters.
4. All study To convert the consumers to customers
5. To conceal the fact fact of prepaid meters
6. To conceal the fact of TOD i.e. to implement Surging charges in peak periods 
7. All study how it will affect the health by way of radiation 
8. All study how it will respond to fire explosion and wild fire
9. All study how crores of meters shall be disposed at one time.
10. All study on adverse effects on environment after the disposal of croresof electric meters 
11. How notices can be issued to society who is not consumer
12. How society can give consent to install the electric meters of other consumers without their consent.
13. Section and laws to install electric meters without knowledge and written consent of the consumers 
14. Section relied upon to make false statement that smart meters are mandatory
15. Section relied upon to make false statement that it is free of cost
16. Study relied upon to make false statement that the domestic consumer and small commercial shops shall be benefited
17. Study that privacy and movement of the consumers cannot be protected on the basis of reading.
18. That meters cannot be possible to be manipulated 
19. To issue notice without specific date and time.
20. To issue notice without disclosing name of the signitory
21. To issue notice without me too ing the name of the person from whom objections and Clarification can be obtained.
22. Notices without date, name of consumers outward numbers 
23. Notice with threat of disconnection 
24. Notices with police threat 
25. Notices with prosecution under section of causing obstructions to public servants while discharging duty.
26. Study to deny consumers any choice of meters.

He assured to go through all emails and speak with senior officers

I asked him why officers of MSEB should not be prosecuted for cheating citizen fabricating documents and committing criminal breach of trust by puic servants on addition to culpable negligence

Mr. Pravin Pardeshi was very co operative and assured to bring these facts to the knowledge of senior officers for consequential action

Date: 25.8.25
Kamlakar Shenoy 
Gaurang R Vora 
Chetan Trivedi 
Petitiongroup 
Zuhair QZ neeraj Pattath 

MyBmc


Leave a Reply

Your email address will not be published. Required fields are marked *

Kindly donate to keep this site alive!

X